Overhead bridge construction is underway at northbound and southbound 9th Street through Monday, Oct. 3, according to the Florida Department of Transportation.

In order to complete the work, traffic will have to detour from NB and SB 9th Street from 10:30 p.m. Friday night through 6:00 a.m. Monday morning.

Here are the traffic detours:

  • NB 9th Street - Traffic will make a right turn at EB Gandy Blvd., a left turn at NB 4th Street, a left turn at WB Gandy Blvd., a slight right turn at NB Roosevelt Blvd., and finally a right turn at NB 9th Street.
  • SB 9th Street - Traffic will make a left turn at SB Roosevelt Blvd., a left turn at EB Gandy Blvd., a right turn at SB 4th Street, a right turn at WB 94th Ave., and finally a left turn at SB 9th Street.

Detour signs will be installed on the night of the closure to direct traffic, according to FDOT.